Call: 289-962-4003 Email: ar.manjinderkaur@gmail.com Studio: 15845 River Dr, Georgetown, ON WhatsApp: 289-962-4003
KS Designers logo KS Designers PERMITS · DRAWINGS · INTERIORS
SHEET A-211 · RESIDENTIAL PERMIT

Basement walkout & side entrance permits

Permit drawings and city submission for new basement walkouts, side doors, below-grade stairs and separate entrances anywhere in Ontario. Structural, drainage and guard details drawn in-house.

BCIN-qualified drawings
City submission handled
5.0 on Google
Separate side entrance with concrete stairs and railing leading to a basement unit
TYPICAL SCOPE New opening in foundation wall, exterior stairs, retaining walls, guards & drainage
Yes.

Do you need a permit for a basement walkout or side door?

Almost always. Cutting a new opening in a foundation wall changes the structure, and the new stairs, guards, landing and drainage all have to meet the Ontario Building Code. If the entrance serves a second unit, fire separation and exit rules apply too. We confirm your city's requirements before we draw anything.

DRAWING INDEX

The sheets in a typical permit set

Every property is different, so we confirm the exact list with your city. Most applications include:

A-001Site plan · entrance location, setbacks, grading
A-101Basement floor plan · existing and proposed
A-201Exterior elevation · new door, stairs, guards
A-301Section through stairs · rise, run, headroom, landing
S-101Structural details · lintel over opening, retaining walls, footings
S-102Drainage details · area drain, sump connection, waterproofing
Floor plans and building sections from a permit drawing set EXAMPLE SHEETS · ILLUSTRATIVE
WHAT WE CHECK

Key requirements we design for

Location & zoning

Side yard width, setbacks and whether your city allows an entrance on that side of the house.

Foundation opening

Lintel sizing over the new door and how the cut affects the wall above.

Stairs & landing

Rise, run, width, headroom and a landing at the door that meet the building code.

Guards & handrails

Guard height and openings around the stairwell, plus handrails on the stairs.

Retaining walls

Walls holding back soil around the stairwell, designed for their height.

Drainage

An area drain at the bottom of the stairs so water does not run into the basement.

AVOID DELAYS

Why these applications get sent back

These are comments plan examiners often raise. We address each one in the drawings before we submit.

We cover this
Side yard too narrow for the entrance or stairs
We cover this
Lintel over the new opening not detailed
We cover this
Stair rise, run or headroom does not meet code
We cover this
No drain shown at the bottom of the stairwell
We cover this
Second-unit exit and fire separation not addressed
THE KS PROCESS

From site visit to issued permit

A-001 · LISTEN01

Site visit

We measure the wall, check the grade and photograph where the entrance will go.

A-100 · DESIGN02

Design & zoning

We confirm setbacks and zoning, then lay out the stairs and opening with you.

A-200 · DRAW03

Drawings & submit

Architectural and structural sheets are completed and submitted to your city.

A-300 · APPROVE04

Comments & permit

We answer plan-examiner comments until the permit is issued.

FROM OUR CLIENTS 5.0 From 7 Google reviews Read all reviews →
"Had a great experience working with them for our basement second dwelling unit project. The architectural work was done very professionally, with clear drawings, good communication, and attention to detail throughout the process."
Kulwinder K. · Basement second unit · Google review
QUESTIONS

Common questions

Can I add a side entrance if my side yard is narrow?

Sometimes. Each city sets a minimum side yard and some do not allow an entrance on that side at all. We check your zoning first so you know before paying for drawings.

Do I need an engineer for a walkout?

The opening, lintel and retaining walls need structural design. We prepare structural details in-house and coordinate with a licensed engineer when your city or the design requires a seal.

Is a walkout the same as a separate entrance for a second unit?

Physically similar, but an entrance that serves a second unit also has to meet exit and fire separation rules. We design it to meet both.

Can you legalize an entrance that was already built?

Often, yes. We measure what is there, prepare as-built drawings, and show any changes needed to meet code.

What should I send for a quote?

Your address, a photo of where you want the entrance, and your survey if you have one.

Planning a walkout or separate entrance?

Send us your address and a photo of where you want the door. We'll tell you what the city will need and what it costs.

RELATED SERVICES

Often done together

Basement apartment permitLegal second units, new or existing.Learn more → Load-bearing wall removalBeam sizing and structural drawings.Learn more → Interior designLayouts and finishes, seen in 3D first.Learn more → Deck permitAttached and raised decks.Learn more →
WhatsApp us